Manufacturing · head to head
ABB 800xA vs JobBOSS²

ABB 800xA
Manufacturing
Distributed control system and process automation platform for continuous and hybrid process plants
- From
- On request
- Rated
- -

JobBOSS²
Manufacturing
ECI shop control system formed by merging JobBOSS and E2 Shop System into one product line
- From
- On request
- Rated
- -
The short version
- Each has a real cost: ABB 800xA licensing is by I/O count, controller count and workplace clients, and none of it is published, so two plants of similar size can be quoted very differently with no external benchmark to argue against.; JobBOSS² the product is a merger of two legacy systems, so existing JobBOSS and E2 customers face a migration and retraining project whose cost is negotiated case by case and is easy to underestimate.
- They diverge on capability: ABB 800xA covers Extended Automation, JobBOSS² covers Estimating and quoting.
- Prices and features above were last checked on 1 September 2026.
Where they differ
Only the attributes on which ABB 800xA and JobBOSS² actually diverge.
Identical on both: starting price (On request), pricing model (quote), free tier (No), user rating (Not yet rated), category (Manufacturing).
What each one covers
Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.
Only in ABB 800xA
- Extended Automation
- AC 800M controllers
- Connectivity servers
- Safety integration
- IEC 61850 electrical
- Batch management
- Information management
- Asset optimisation
Only in JobBOSS²
- Estimating and quoting
- Order and job management
- Shop floor data collection
- Scheduling
- Job costing
- Integrated accounting
What people use each for
The jobs each tool is most often brought in to do.
ABB 800xA
- A refinery replacing operator consoles and control room infrastructure while keeping working field controllers in placenot JobBOSS²
- A pulp and paper mill consolidating process, electrical and safety monitoring into a single operator workplacenot JobBOSS²
- A mining operation that needs SIL 3 safety functions on the same network as process control rather than a separate safety systemnot JobBOSS²
- A marine or offshore platform where ABB already supplies the electrical distribution and IEC 61850 integration removes a second systemnot JobBOSS²
JobBOSS²
- A job shop quoting from spreadsheets that wants estimating, routing and costing in one systemnot ABB 800xA
- An existing JobBOSS or E2 Shop System customer evaluating whether to migrate or replacenot ABB 800xA
- A make to order fabricator that needs accounting inside the manufacturing system rather than alongside itnot ABB 800xA
- A shop that wants operator time capture at work centres to make job costing reflect what actually happenednot ABB 800xA
Where each one falls short
Documented limitations, not opinions. Every one is a constraint you would hit in normal use.
ABB 800xA
- Licensing is by I/O count, controller count and workplace clients, and none of it is published, so two plants of similar size can be quoted very differently with no external benchmark to argue against.
- Engineering and commissioning typically cost more than the software and controller hardware together, and that share is not visible in the initial ABB quotation, which prices the system rather than the project.
- It is Windows only for servers and workplaces, so the operating system lifecycle drives forced upgrade cycles that have nothing to do with your process.
- Once configured, the aspect object model and the specific integrator conventions used make handing the system to a different service provider expensive; ABB service contracts are effectively sticky.
- Software maintenance is an annual contract on top of the licence and lapsing it means you cannot take version upgrades, so the system quietly ages out of security support if the plant skips renewals to save money.
JobBOSS²
- The product is a merger of two legacy systems, so existing JobBOSS and E2 customers face a migration and retraining project whose cost is negotiated case by case and is easy to underestimate.
- ECI is a private equity owned portfolio company with many vertical products, and buyers should read renewal, uplift and support tier terms carefully because the commercial model is built around long term contracted revenue.
- Machine connectivity is limited, so shop floor data comes from operators clocking in and out rather than from controllers, and any automatic utilisation measurement needs a separate monitoring product.
- Reporting is rigid compared with a modern system and most shops end up exporting to Excel for anything beyond the supplied reports, which reintroduces the spreadsheets the system was bought to eliminate.
- The user interface carries its lineage and takes longer to learn than a current generation web application, which matters most for occasional users such as estimators and purchasing staff.
Pricing, plan by plan
ABB 800xA
On request- ABB Ability System 800xA$undefined/year
- Licensed by I/O count, controller count and workplace clients
- Sold as a project through ABB or a certified partner
- Annual software maintenance contract priced separately
JobBOSS²
On request- JobBOSS²$undefined/year
- Quoting through invoicing for job shops
- Shop floor data collection and scheduling
- Hosted or on premises deployment
Which should you pick?
Choose ABB 800xA if
- You need extended automation.
- You work on Windows.
- You also want ac 800m controllers.
Choose JobBOSS² if
- You need estimating and quoting.
- You work on Windows, Web.
- You also want order and job management.
Questions people ask
- Is ABB 800xA or JobBOSS² better?
- Neither clearly leads. ABB 800xA starts at On request and JobBOSS² at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
- Which is cheaper, ABB 800xA or JobBOSS²?
- ABB 800xA starts at On request and JobBOSS² at On request.
- Does ABB 800xA or JobBOSS² run on more platforms?
- ABB 800xA runs on Windows. JobBOSS² runs on Windows, Web.
- What is ABB 800xA best used for?
- ABB 800xA is most often used for a refinery replacing operator consoles and control room infrastructure while keeping working field controllers in place, a pulp and paper mill consolidating process, electrical and safety monitoring into a single operator workplace, a mining operation that needs sil 3 safety functions on the same network as process control rather than a separate safety system, a marine or offshore platform where abb already supplies the electrical distribution and iec 61850 integration removes a second system. Of those, a refinery replacing operator consoles and control room infrastructure while keeping working field controllers in place and a pulp and paper mill consolidating process, electrical and safety monitoring into a single operator workplace are not what JobBOSS² is typically brought in for.
- What can ABB 800xA do that JobBOSS² cannot?
- ABB 800xA covers Extended Automation, AC 800M controllers, Connectivity servers, Safety integration. JobBOSS² covers Estimating and quoting, Order and job management, Shop floor data collection, Scheduling.
Answered from the vendors’ own pages
ABB 800xA: Is 800xA sold as a perpetual licence?
Yes, the system licence is perpetual, but a separate annual software maintenance agreement is required to receive updates and version upgrades.
JobBOSS²: What happened to E2 Shop System?
ECI acquired it and merged it with JobBOSS into the combined JobBOSS² line. Legacy customers are directed towards migration.
ABB 800xA: Can 800xA control non-ABB field hardware?
Yes. Connectivity servers front third-party PLC and DCS systems and legacy ABB families, which is the main reason it wins brownfield projects.
JobBOSS²: Is it cloud based?
It is offered hosted and on premises. Hosted is not the same as a cloud native architecture, and performance expectations should be set accordingly.
ABB 800xA: Does it replace a separate electrical SCADA?
It can. IEC 61850 substation integration is native, so many plants drop a separate electrical monitoring system.
JobBOSS²: Does it include accounting?
Yes, accounting is part of the product, which is one of the main reasons small shops choose it over an ERP plus separate finance package.
ABB 800xA: What is the realistic implementation timeline?
A full plant migration is measured in years, not months; phased cutovers of one unit at a time are the norm.
JobBOSS²: Can it read data from my CNC machines?
Not natively in any meaningful way. Data collection is operator driven, so shops wanting spindle level data buy a monitoring platform alongside it.
Related pages
Other head to heads
- ABB 800xA vs AVEVA System Platform
- ABB 800xA vs Ignition
- ABB 800xA vs Yokogawa CENTUM VP
- ABB 800xA vs GENESIS Version 11
- ABB 800xA vs Siemens WinCC Unified
- ABB 800xA vs COPA-DATA zenon
- ABB 800xA vs Rockwell FactoryTalk
- ABB 800xA vs Authentise
- ABB 800xA vs Kepware Server
- ABB 800xA vs QAD Redzone
- ABB 800xA vs Samotics
- ABB 800xA vs Sight Machine
- ABB 800xA vs Simplify3D
- ABB 800xA vs TrendMiner
- ABB 800xA vs Waites Sensor Technologies
- ABB 800xA vs Xometry
- ABB 800xA vs AMFG
- ABB 800xA vs Paperless Parts
- ABB 800xA vs ProShop ERP
- ABB 800xA vs Prodsmart
- ABB 800xA vs PTC Windchill
- ABB 800xA vs SolidWorks
- ABB 800xA vs LabVIEW
- ABB 800xA vs Duro PLM
- ABB 800xA vs Dyndrite
- ABB 800xA vs Erbessd Instruments
- ABB 800xA vs Autodesk Netfabb
- JobBOSS² vs AVEVA System Platform
- JobBOSS² vs Ignition
- JobBOSS² vs Yokogawa CENTUM VP
- JobBOSS² vs GENESIS Version 11
- JobBOSS² vs Siemens WinCC Unified
- JobBOSS² vs COPA-DATA zenon
- JobBOSS² vs Rockwell FactoryTalk
- JobBOSS² vs Authentise
- JobBOSS² vs Kepware Server
- JobBOSS² vs QAD Redzone
- JobBOSS² vs Samotics
- JobBOSS² vs Sight Machine
- JobBOSS² vs Simplify3D
- JobBOSS² vs TrendMiner
- JobBOSS² vs Waites Sensor Technologies
- JobBOSS² vs Xometry
- JobBOSS² vs AMFG
- JobBOSS² vs Paperless Parts
- JobBOSS² vs ProShop ERP
- JobBOSS² vs Prodsmart
- JobBOSS² vs PTC Windchill
- JobBOSS² vs SolidWorks
- JobBOSS² vs LabVIEW
- JobBOSS² vs Duro PLM
- JobBOSS² vs Dyndrite
- JobBOSS² vs Erbessd Instruments
- JobBOSS² vs Autodesk Netfabb
