Construction · head to head
CMiC vs Hover

CMiC
Construction
Cloud-based construction management software
- From
- $300/month
- Free plan
- No

Hover
Construction
Turns phone photos into 3D property models with measurements, designs and estimates
- From
- On request
- Free plan
- No
The short version
- CMiC is a comprehensive cloud-based construction management software.
- CMiC starts at $300/mo, Hover at $999/yr.
- Only CMiC lists job costing; only Hover lists 3D model from phone photos.
- Where CMiC falls short: no specific pricing disclosed on website.
- Where Hover falls short: each project is charged separately on lower plans.
- Prices and features on this page were last checked on 26 November 2026.
How do CMiC and Hover differ?
CMiC and Hover differ on starting price ($300/month against On request), pricing model (Subscription against Usage-based) and platforms (Web, iOS, Android against Web). Only the attributes on which CMiC and Hover actually diverge.
Identical on both: free tier (No), category (Construction).
Not yet recorded: founded for Hover.
Which features does each one have?
They share no listed features; 16 appear only for CMiC and 8 only for Hover. Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.
Only in CMiC
- Project management
- Accounting
- Document management
- Job costing
- Field operations
- QuickBooks
- Sage
- Microsoft 365
Only in Hover
- 3D model from phone photos
- Roof, siding and interior measurements
- Design with real materials
- Estimates and material lists
- Proposals and agreements
- Project progress photos and tasks
- CRM and project management sync
- Single sign-on on higher plans
What is each one used for?
CMiC is most often brought in for insurance and risk management; Hover for roofing and siding measurement. The jobs each tool is most often brought in to do.
CMiC
- Insurance and risk managementnot Hover
- Professional liability coveragenot Hover
- Construction industry insurancenot Hover
Hover
- Roofing and siding measurementnot CMiC
- Insurance claim scopingnot CMiC
- Remodelling proposalsnot CMiC
- Window and gutter estimatesnot CMiC
- Interior floor plan capturenot CMiC
Where do CMiC and Hover fall short?
CMiC's most cited limit: no specific pricing disclosed on website. Hover's: each project is charged separately on lower plans. Documented limitations, not opinions. Every one is a constraint you would hit in normal use.
CMiC
- No specific pricing disclosed on website
- Website directs users to /pricing page for quotes only
- Custom quoting model used for all customers
- No tiered plans or standard pricing published
Hover
- Each project is charged separately on lower plans
- Design, estimate and agreement tools need Pro or above
- Does not replace accounting or scheduling software
- Enterprise pricing is only by custom quote
How much do CMiC and Hover cost?
CMiC starts at $300/mo; Hover starts at $999/yr. Plan by plan below, from each vendor's own pricing page.
CMiC
$300/month- Core$300/mo
- Project management
- Accounting
- Document management
- EnterpriseFree
- Mobile field app
- Advanced analytics
- API access
Hover
On request- Pro$999/yr
- $20 off every project
- Full 2D designs, estimates and agreements
- CRM sync
- Business$2,999/yr
- Flat rate by project type
- Up to 10 branches
- Single sign-on
Which should you pick?
Choose CMiC if
- You need project management.
- You work on Web, iOS, Android.
- You also want accounting.
Choose Hover if
- You need 3d model from phone photos.
- You also want roof, siding and interior measurements.
Questions people ask
- Is CMiC or Hover better?
- Neither clearly leads. CMiC starts at $300/month and Hover at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
- Which is cheaper, CMiC or Hover?
- CMiC starts at $300/month and Hover at On request.
- Does CMiC or Hover run on more platforms?
- CMiC runs on Web, iOS, Android. Hover runs on Web.
- What is CMiC best used for?
- CMiC is most often used for insurance and risk management, professional liability coverage, construction industry insurance. Of those, insurance and risk management and professional liability coverage are not what Hover is typically brought in for.
- What can CMiC do that Hover cannot?
- CMiC covers Project management, Accounting, Document management, Job costing. Hover covers 3D model from phone photos, Roof, siding and interior measurements, Design with real materials, Estimates and material lists.
Answered from the vendors’ own pages
CMiC: How much does CMiC cost?
CMiC does not publish fixed pricing on its website. The company uses a custom quote model. Interested parties must visit the /pricing page or contact CMiC directly to request a quote for their specific needs.
SourceHover: How much does Hover cost?
Starter is pay per project with the first three free. Pro is $999 per year and Business is $2,999 per year, with Enterprise custom.
SourceCMiC: What is CMiC's pricing model?
CMiC uses a custom enterprise pricing model rather than published tiered plans. All pricing is determined on a case-by-case basis through their sales team.
SourceHover: What does Hover produce from photos?
A 3D model with measurements, which can be used for designs, estimates, material lists and proposals.
SourceHover: Does Hover connect to other tools?
The vendor says it fits into CRM, estimating and marketing tools, and Pro adds CRM and project management sync.
SourceHover: Who uses Hover?
Construction professionals, insurance experts and homeowners.
SourceRelated pages
Other head to heads
- CMiC vs Jonas Premier
- CMiC vs Viewpoint Vista
- CMiC vs Sage 300 Construction
- CMiC vs Procore
- CMiC vs Foundation Software
- CMiC vs Briq
- CMiC vs e-Builder
- CMiC vs Deltek ComputerEase
- CMiC vs ConstructionOnline
- CMiC vs Adaptive
- CMiC vs HCSS
- CMiC vs Smartsheet Construction
- CMiC vs Tekla Structures
- CMiC vs ALICE Technologies
- CMiC vs Bentley OpenBuildings Designer
- CMiC vs Billd
- CMiC vs Bridgit Bravo
- CMiC vs Sage 100 Contractor
- CMiC vs AccuLynx
- CMiC vs Propeller Aero
- CMiC vs JobNimbus
- CMiC vs Buildxact
- CMiC vs Houzz Pro
- CMiC vs Reconstruct
- CMiC vs HCSS HeavyBid
- CMiC vs Togal.AI
- CMiC vs Cubit Estimating
- CMiC vs RIB CostX
- CMiC vs Egnyte
- CMiC vs On-Screen Takeoff
- CMiC vs STACK Construction Technologies
- CMiC vs BricsCAD BIM
- CMiC vs Contractor Foreman
- Hover vs Jonas Premier
- Hover vs Viewpoint Vista
- Hover vs Sage 300 Construction
- Hover vs Procore
- Hover vs Foundation Software
- Hover vs Briq
- Hover vs e-Builder
- Hover vs Deltek ComputerEase
- Hover vs ConstructionOnline
- Hover vs Adaptive
- Hover vs HCSS
- Hover vs Smartsheet Construction
- Hover vs Tekla Structures
- Hover vs ALICE Technologies
- Hover vs Bentley OpenBuildings Designer
- Hover vs Billd
- Hover vs Bridgit Bravo
- Hover vs Sage 100 Contractor
- Hover vs AccuLynx
- Hover vs Propeller Aero
- Hover vs JobNimbus
- Hover vs Buildxact
- Hover vs Houzz Pro
- Hover vs Reconstruct
- Hover vs HCSS HeavyBid
- Hover vs Togal.AI
- Hover vs Cubit Estimating
- Hover vs RIB CostX
- Hover vs Egnyte
- Hover vs On-Screen Takeoff
- Hover vs STACK Construction Technologies
- Hover vs BricsCAD BIM
- Hover vs Contractor Foreman
