Automation Integration · head to head
Dagster vs Microsoft Power Automate

Dagster
Automation Integration
Data orchestration platform with asset lineage and AI-native observability
- From
- Free
- Rated
- -

Microsoft Power Automate
Automation Integration
Automate tasks across cloud and on-premises apps
- From
- Free
- Rated
- -
The short version
- Each has a real cost: Dagster learning curve steeper than simpler task schedulers; Microsoft Power Automate free plan limited to 750 flow runs/month and standard connectors only; premium connectors require paid plans
- They diverge on capability: Dagster covers Asset-centric orchestration, Microsoft Power Automate covers Automated flows.
Where they differ
Only the attributes on which Dagster and Microsoft Power Automate actually diverge.
| Attribute | Dagster | Microsoft Power Automate |
|---|---|---|
| Pricing model | Free open-source core plus paid cloud platform | Unknown |
| Platforms | Cloud, Self-hosted | Web, Cloud, Desktop |
| Founded | Unknown | 2016 |
Identical on both: starting price (Free), free tier (Yes), user rating (Not yet rated), category (Automation Integration).
What each one covers
Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.
Only in Dagster
- Asset-centric orchestration
- Lineage tracking
- Data quality monitoring
- Multi-tool integration
- Branch deployments
- Dagster+ AI
- Hybrid deployment
Only in Microsoft Power Automate
- Automated flows
- Instant flows
- Scheduled flows
- Desktop automation
- Process mining
- Business process flows
- Approval workflows
- 500+ connectors
What people use each for
The jobs each tool is most often brought in to do.
Dagster
- Orchestrating multi-stage data transformation pipelinesnot Microsoft Power Automate
- Tracking data lineage across transformation toolsnot Microsoft Power Automate
- Monitoring data quality and asset healthnot Microsoft Power Automate
- Coordinating dbt and Snowflake workflowsnot Microsoft Power Automate
Microsoft Power Automate
- Workflow Automationnot Dagster
- Data Integrationnot Dagster
- Process Automationnot Dagster
- App Integrationnot Dagster
- API Connectivitynot Dagster
Where each one falls short
Documented limitations, not opinions. Every one is a constraint you would hit in normal use.
Dagster
- Learning curve steeper than simpler task schedulers
- Asset-centric model requires redesigning existing task-based pipelines
- Pricing complex with per-credit costs on top of base fee
- Open-source version requires self-hosting infrastructure
- Limited to data workflows; not suitable for general automation
Microsoft Power Automate
- Free plan limited to 750 flow runs/month and standard connectors only; premium connectors require paid plans
- Not suitable for long-running workflows; can fail unexpectedly without warning
- Limited to simple linear logic; fails with complex workflows involving multiple stakeholders
- Tasks cannot automate at scale when requiring more than approximately 60 users
Pricing, plan by plan
Dagster
Free- Open SourceFree
- Self-hosted deployment
- Full orchestration engine
- Community support
- Solo$10/month
- 1 user and 1 code location
- Pay-as-you-go credits at $0.040 per credit
- 1 deployment
- Starter$100/month
- Up to 3 users and 5 code locations
- Better credit rate at $0.035 per credit
- 1 deployment
- Pro$null/custom
- Unlimited code locations and deployments
- Custom serverless compute pricing
- Personalized onboarding
Microsoft Power Automate
Free- FreeFree
- 750 flow runs/month
- Standard connectors only
- Basic cloud flows
- Premium$15/user/month
- Cloud flows (DPA)
- Attended RPA
- 250 MB Dataverse database
- Process$150/bot/month
- Unattended automation
- Cloud and desktop flows
- 50 MB Dataverse database
- Hosted Process$215/bot/month
- Microsoft-managed virtual machine
- Unattended automation
- Same Dataverse entitlements as Process plan
Which should you pick?
Choose Dagster if
- You need asset-centric orchestration.
- You want to start without paying.
- You work on Cloud, Self-hosted.
- You also want lineage tracking.
Choose Microsoft Power Automate if
- You need automated flows.
- You want to start without paying.
- You work on Web, Cloud, Desktop.
- You also want instant flows.
Questions people ask
- Is Dagster or Microsoft Power Automate better?
- Neither clearly leads. Dagster starts at Free and Microsoft Power Automate at Free, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
- Which is cheaper, Dagster or Microsoft Power Automate?
- Dagster starts at Free and Microsoft Power Automate at Free.
- Does Dagster or Microsoft Power Automate run on more platforms?
- Dagster runs on Cloud, Self-hosted. Microsoft Power Automate runs on Web, Cloud, Desktop.
- Can I use Dagster for free?
- Both have a free tier, so you can try either at no cost before committing.
- What is Dagster best used for?
- Dagster is most often used for orchestrating multi-stage data transformation pipelines, tracking data lineage across transformation tools, monitoring data quality and asset health, coordinating dbt and snowflake workflows. Of those, orchestrating multi-stage data transformation pipelines and tracking data lineage across transformation tools are not what Microsoft Power Automate is typically brought in for.
- What can Dagster do that Microsoft Power Automate cannot?
- Dagster covers Asset-centric orchestration, Lineage tracking, Data quality monitoring, Multi-tool integration. Microsoft Power Automate covers Automated flows, Instant flows, Scheduled flows, Desktop automation.
Answered from the vendors’ own pages
Dagster: What does Solo plan at $10/month include?
Solo includes 1 user, 1 code location, 1 deployment, and serverless compute at $0.010/minute, with 30-day free trial.
SourceMicrosoft Power Automate: Is Power Automate included with Microsoft 365?
Yes. If you have an eligible Microsoft 365 subscription, you can use Power Automate at no extra cost for flows relying only on standard connectors (SharePoint, Outlook, Teams). Premium connectors (Salesforce, SAP, Oracle) require paid plans.
SourceDagster: How are credits calculated on Dagster+?
Each asset materialization and ops execution costs 1 credit. Solo plan charges $0.040 per credit; Starter reduces to $0.035 per credit.
SourceMicrosoft Power Automate: How many flow runs are allowed on the free plan?
Power Automate's free tier (included with Microsoft 365) is limited to 750 flow runs per month and standard connectors only. Out of 900+ total connectors, the free plan only includes Microsoft ecosystem apps and limited third-party apps.
SourceDagster: Is Dagster open-source available for free?
Yes, Dagster open-source is free and includes the full orchestration engine for self-hosted deployment with community support.
SourceMicrosoft Power Automate: What's the difference between Premium and Process plans?
Premium ($15/user/month) provides attended automation with cloud flows and standard RPA. Process plan ($150/bot/month) enables unattended automation where bots run without human intervention on virtual machines for high-volume, repetitive tasks.
SourceMicrosoft Power Automate: Does Power Automate support long-running workflows?
No. Power Automate is not suitable for long-lasting workflows because they can run without warning and fail unexpectedly. The platform is built for linear, branching logic (if-then) rather than complex, multi-step business processes involving multiple stakeholders.
SourceRelated pages
More on Microsoft Power Automate
Other head to heads
- Dagster vs n8n
- Dagster vs Zapier
- Dagster vs MuleSoft
- Dagster vs Parabola
- Dagster vs Airbyte
- Dagster vs Prefect
- Dagster vs Automation Anywhere
- Dagster vs Blue Prism
- Dagster vs CrewAI
- Dagster vs Fivetran
- Dagster vs Mage AI
- Dagster vs Temporal
- Dagster vs UiPath
- Dagster vs Workato
- Dagster vs Jitterbit
- Dagster vs mParticle
- Dagster vs Paragon
- Microsoft Power Automate vs n8n
- Microsoft Power Automate vs Zapier
- Microsoft Power Automate vs MuleSoft
- Microsoft Power Automate vs Parabola
- Microsoft Power Automate vs Airbyte
- Microsoft Power Automate vs Prefect
- Microsoft Power Automate vs Automation Anywhere
- Microsoft Power Automate vs Blue Prism
- Microsoft Power Automate vs CrewAI
- Microsoft Power Automate vs Fivetran
- Microsoft Power Automate vs Mage AI
- Microsoft Power Automate vs Temporal
- Microsoft Power Automate vs UiPath
- Microsoft Power Automate vs Workato
- Microsoft Power Automate vs Jitterbit
- Microsoft Power Automate vs mParticle
- Microsoft Power Automate vs Paragon
