Softwr

Construction · head to head

Bridgit Bravo vs Topcon MAGNET

Bridgit Bravo logo

Bridgit Bravo

Construction

Workforce planning for general contractors allocating salaried project staff across a pipeline

From
On request
Rated
-
Topcon MAGNET logo

Topcon MAGNET

Construction

Field, office and cloud software for surveying and civil construction, built around Topcon instruments

From
On request
Rated
-

The short version

  • Each has a real cost: Bridgit Bravo it plans salaried project staff, not hourly craft labour, so speciality subcontractors dispatching crews will find it does not match how they work at all.; Topcon MAGNET mAGNET is built around Topcon and Sokkia hardware, so a firm running mixed instrument brands will not get the field workflows it expects and is better served by manufacturer-independent field software.
  • They diverge on capability: Bridgit Bravo covers People and project allocation, Topcon MAGNET covers MAGNET Field.
  • Prices and features above were last checked on 1 September 2026.

Where they differ

Only the attributes on which Bridgit Bravo and Topcon MAGNET actually diverge.

Attributes where Bridgit Bravo and Topcon MAGNET differ
AttributeBridgit BravoTopcon MAGNET
PlatformsWeb, iOS, AndroidWindows, Android, Web

Identical on both: starting price (On request), pricing model (quote), free tier (No), user rating (Not yet rated), category (Construction).

What each one covers

Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.

Only in Bridgit Bravo

  • People and project allocation
  • Pursuit scenario planning
  • Utilisation reporting
  • Hiring forecasts
  • Skills and certification tracking
  • Project timeline view

Only in Topcon MAGNET

  • MAGNET Field
  • MAGNET Office
  • MAGNET Enterprise
  • Machine control model preparation
  • Mass haul and earthwork
  • Point layout and stakeout
  • Live field to office link
  • Standard format exchange

What people use each for

The jobs each tool is most often brought in to do.

Bridgit Bravo

  • A general contractor deciding whether it has the superintendents to take on a pursuit before bidding itnot Topcon MAGNET
  • An operations director replacing a staffing spreadsheet that only one person understandsnot Topcon MAGNET
  • A contractor forecasting hiring needs from backlog rather than from last-minute panicnot Topcon MAGNET
  • A multi-office builder needing visibility of who is available across regional teamsnot Topcon MAGNET

Topcon MAGNET

  • A civil contractor running Topcon grade control that needs design models prepared and pushed to machines from one environmentnot Bridgit Bravo
  • A survey crew doing construction layout with Topcon total stations and wanting field data to reach the office without a memory cardnot Bridgit Bravo
  • An earthworks estimator producing takeoff quantities and mass haul plans from engineering drawingsnot Bridgit Bravo
  • A firm standardising on one manufacturer end to end to reduce the number of software packages its crews have to learnnot Bridgit Bravo

Where each one falls short

Documented limitations, not opinions. Every one is a constraint you would hit in normal use.

Bridgit Bravo

  • It plans salaried project staff, not hourly craft labour, so speciality subcontractors dispatching crews will find it does not match how they work at all.
  • It is a planning layer only; it does not schedule tasks, track time or connect to payroll, so the allocations are as accurate as the discipline of the person maintaining them.
  • Value collapses if executives do not use the forecasts, because the effort of keeping allocations current sits with operations staff who get little back from data entry alone.
  • Integration with project management and enterprise resource planning systems keeps project lists in sync but does not resolve conflicting definitions of what a project is, which surfaces immediately in reporting.
  • Pricing is per user and the natural instinct is to buy seats for everyone who wants visibility, which inflates cost well beyond the handful of planners who actually maintain data.

Topcon MAGNET

  • MAGNET is built around Topcon and Sokkia hardware, so a firm running mixed instrument brands will not get the field workflows it expects and is better served by manufacturer-independent field software.
  • Topcon does not publish a rate card and sells through dealers, so two customers can pay materially different prices for the same licences depending on region and negotiation.
  • Cloud connectivity through MAGNET Enterprise is commonly bundled for the first year and then charged, which surprises firms that budgeted only for the licence.
  • Office capability is spread across modules and disciplines rather than sold as one product, so getting from data collection to machine control model preparation can require more than one purchase.
  • The office desktop software is Windows only and the wider line has been reorganised more than once, so buyers should confirm which specific product name their dealer is quoting and how long it will be supported.

Pricing, plan by plan

Bridgit Bravo

On request
  • Bridgit Bravo$undefined/year
    • Workforce planning and allocation
    • Scenario planning
    • Utilisation and forecast reporting

Topcon MAGNET

On request
  • MAGNET Field$undefined/year
    • Data collector licence
    • Sold through Topcon dealers
    • Annual service plan renewals available
  • MAGNET Office$undefined/year
    • Desktop licence with modules by discipline
    • Includes cloud connectivity for a first year
    • Renewal quoted separately
  • MAGNET Enterprise$undefined/year
    • Cloud project storage and field to office exchange
    • Subscription renewed annually
    • Bundled initially with Office licences

Which should you pick?

Choose Bridgit Bravo if

  • You need people and project allocation.
  • You work on Web, iOS, Android.
  • You also want pursuit scenario planning.

Choose Topcon MAGNET if

  • You need magnet field.
  • You work on Windows, Android, Web.
  • You also want magnet office.

Questions people ask

Is Bridgit Bravo or Topcon MAGNET better?
Neither clearly leads. Bridgit Bravo starts at On request and Topcon MAGNET at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
Which is cheaper, Bridgit Bravo or Topcon MAGNET?
Bridgit Bravo starts at On request and Topcon MAGNET at On request.
Does Bridgit Bravo or Topcon MAGNET run on more platforms?
Bridgit Bravo runs on Web, iOS, Android. Topcon MAGNET runs on Windows, Android, Web.
What is Bridgit Bravo best used for?
Bridgit Bravo is most often used for a general contractor deciding whether it has the superintendents to take on a pursuit before bidding it, an operations director replacing a staffing spreadsheet that only one person understands, a contractor forecasting hiring needs from backlog rather than from last-minute panic, a multi-office builder needing visibility of who is available across regional teams. Of those, a general contractor deciding whether it has the superintendents to take on a pursuit before bidding it and an operations director replacing a staffing spreadsheet that only one person understands are not what Topcon MAGNET is typically brought in for.
What can Bridgit Bravo do that Topcon MAGNET cannot?
Bridgit Bravo covers People and project allocation, Pursuit scenario planning, Utilisation reporting, Hiring forecasts. Topcon MAGNET covers MAGNET Field, MAGNET Office, MAGNET Enterprise, Machine control model preparation.

Answered from the vendors’ own pages

Bridgit Bravo: Does it work for subcontractors?

Not really. It plans named salaried staff over months. A speciality subcontractor dispatching craft crews weekly needs a crew scheduling and dispatch tool instead.

Topcon MAGNET: Does MAGNET work with Trimble or Leica instruments?

Not as a practical daily workflow. It exchanges standard file formats but the field software is designed for Topcon and Sokkia hardware.

Bridgit Bravo: Does it schedule construction work?

No. It plans people against projects. Task and activity scheduling stays in your programme or project management tool.

Topcon MAGNET: Is pricing published?

No. MAGNET is sold through Topcon dealers with quotes varying by region and configuration.

Bridgit Bravo: What does it replace?

A staffing spreadsheet, and usually the meeting held to reconcile competing versions of it.

Topcon MAGNET: Is the cloud service included?

Typically for a first year with a licence, then renewable as a paid subscription.

Topcon MAGNET: Can I get my data out at project closeout?

Yes, through LandXML, DXF and standard survey exchange formats, though field-specific configuration does not transfer to a competitor.

Share

Related pages

Other head to heads