Energy · head to head
EnergyCAP vs Helioscope
The short version
- Each has a real cost: EnergyCAP priced per meter per year, so cost scales with how many utility connection points exist rather than with users or sites; Helioscope licences are single user, so each designer needs their own
- They diverge on capability: EnergyCAP covers Utility bill management, Helioscope covers PV system design.
- Prices and features above were last checked on 30 August 2026.
Where they differ
Only the attributes on which EnergyCAP and Helioscope actually diverge.
| Attribute | EnergyCAP | Helioscope |
|---|---|---|
| Starting price | $1000/month | $159/month |
| Founded | 1980 | 2012 |
Identical on both: pricing model (subscription), free tier (No), platforms (Web, Api), user rating (Not yet rated), category (Energy).
What each one covers
Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.
Only in EnergyCAP
- Utility bill management
- Energy accounting
- Cost allocation
- Sustainability reporting
- Weather normalization
- Rate analysis
- Budgeting
- Benchmarking
Only in Helioscope
- PV system design
- 3D shade modeling
- Performance simulation
- Single-line diagrams
- BOM generation
- Proposal templates
- Component database
- Financial modeling
Both cover
- SOC2
- Cloud deployment
What people use each for
The jobs each tool is most often brought in to do.
EnergyCAP
- Tracking utility bills and energy consumption across a property portfolionot Helioscope
- Reporting on energy spend and emissions for an organisationnot Helioscope
Helioscope
- Solar project design and modelingnot EnergyCAP
- Rooftop, carport, and ground-mount solar system planningnot EnergyCAP
- Financial analysis and sales proposal generation for solar installationsnot EnergyCAP
Where each one falls short
Documented limitations, not opinions. Every one is a constraint you would hit in normal use.
EnergyCAP
- Priced per meter per year, so cost scales with how many utility connection points exist rather than with users or sites
- No figure is published at any level, and every package is quoted by sales
- Emissions, interval data, bill capture and bill pay are separately priced add ons rather than part of the core platform
Helioscope
- Licences are single user, so each designer needs their own
- Projects are capped at 10 a month on both Basic and Pro
- System size is capped by plan, at 1.25 MW DC on Basic and 5 MW on Pro, so a larger array forces an upgrade regardless of project count
- Trackers, LIDAR modelling and API access sit on the higher tiers
- Enterprise is priced per project with no published figure
Pricing, plan by plan
EnergyCAP
$1000/month- Essential$1000/month
- Utility bill management
- Energy tracking
- Basic reporting
- Professional$2500/month
- Advanced analytics
- Sustainability reporting
- Budgeting tools
- Enterprise$undefined/month
- Unlimited users
- Custom integrations
- API access
Helioscope
$159/month- Basic$159/month
- 1 user per license
- 10 projects per month (120 per year)
- 15% discount for annual billing ($1,620/year)
- Pro$259/month
- 1 user per license
- 10 projects per month (120 per year)
- 15% discount for annual billing ($2,640/year)
- Enterprise$null/month
- Unlimited users
- Unlimited projects
- Custom pricing
Which should you pick?
Choose EnergyCAP if
- You need utility bill management.
- You work on Web, Api.
- You also want energy accounting.
Choose Helioscope if
- You need pv system design.
- You work on Web, Api.
- You also want 3d shade modeling.
Questions people ask
- Is EnergyCAP or Helioscope better?
- Neither clearly leads. EnergyCAP starts at $1000/month and Helioscope at $159/month, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
- Which is cheaper, EnergyCAP or Helioscope?
- EnergyCAP starts at $1000/month and Helioscope at $159/month.
- Does EnergyCAP or Helioscope run on more platforms?
- Both run on Web, Api, so platform support will not decide this one for you.
- What is EnergyCAP best used for?
- EnergyCAP is most often used for tracking utility bills and energy consumption across a property portfolio, reporting on energy spend and emissions for an organisation. Of those, tracking utility bills and energy consumption across a property portfolio and reporting on energy spend and emissions for an organisation are not what Helioscope is typically brought in for.
- What can EnergyCAP do that Helioscope cannot?
- EnergyCAP covers Utility bill management, Energy accounting, Cost allocation, Sustainability reporting. Helioscope covers PV system design, 3D shade modeling, Performance simulation, Single-line diagrams. Both handle SOC2, Cloud deployment.
Answered from the vendors’ own pages
EnergyCAP: What is EnergyCAP's pricing model?
EnergyCAP pricing is based per meter per year. The company allows customers to customize their package by adding premium features such as emissions tracking, interval data analytics, finance modules, bill capture, and bill pay services based on business needs.
SourceHelioscope: What is the starting price for HelioScope?
HelioScope Basic plan costs $159 per month per license with annual billing at $1,620/year (15% discount). The Pro plan is $259/month or $2,640/year. Each license covers 1 user. Source: https://helioscope.aurorasolar.com/pricing
SourceEnergyCAP: How much does EnergyCAP cost?
EnergyCAP does not publish specific pricing amounts. Customers must contact sales for a customized quote based on their meter count and selected features.
SourceHelioscope: How many projects can I design monthly with HelioScope Basic and Pro?
Both Basic and Pro plans include 10 projects per month, equaling 120 projects per year. The project allocation is the same across both tiers; the difference is in design capability (1.25 MW for Basic vs. 5 MW for Pro). Source: https://helioscope.aurorasolar.com/pricing
SourceHelioscope: What is the maximum solar design capacity by HelioScope tier?
HelioScope Basic supports designs up to 1.25 MW DC, Pro supports up to 5 MW DC, and Enterprise supports unlimited designs up to 30 MW DC. Accuracy within 1% of PVsyst modeling is maintained across tiers. Source: https://helioscope.aurorasolar.com/pricing
SourceRelated pages
Other head to heads
- EnergyCAP vs Enphase Enlighten
- EnergyCAP vs Fronius SOLARWEB
- EnergyCAP vs ABB Ability
- EnergyCAP vs Aurora Solar
- EnergyCAP vs Influx Energy Management
- EnergyCAP vs Schneider Electric EcoStruxure
- EnergyCAP vs OpenLink Endur
- EnergyCAP vs SAP for Utilities
- EnergyCAP vs Wattwatchers EMS
- EnergyCAP vs AVEVA PI System
- EnergyCAP vs Bidgely UtilityAI
- EnergyCAP vs Honeywell Building Management
- EnergyCAP vs Oracle Utilities
- EnergyCAP vs Petrel E&P Software
- EnergyCAP vs Siemens EnergyIP
- EnergyCAP vs SolarWinds
- EnergyCAP vs Azelio Energy Storage
- EnergyCAP vs Clean Power Research PowerClerk
- EnergyCAP vs Enerex
- EnergyCAP vs Stem Athena
- EnergyCAP vs AutoGrid Flex
- EnergyCAP vs PowerFactory DIgSILENT
- EnergyCAP vs GE Digital GridOS
- EnergyCAP vs SMA Energy
- EnergyCAP vs Johnson Controls Metasys
- Helioscope vs Enphase Enlighten
- Helioscope vs Fronius SOLARWEB
- Helioscope vs ABB Ability
- Helioscope vs Aurora Solar
- Helioscope vs Influx Energy Management
- Helioscope vs Schneider Electric EcoStruxure
- Helioscope vs OpenLink Endur
- Helioscope vs SAP for Utilities
- Helioscope vs Wattwatchers EMS
- Helioscope vs AVEVA PI System
- Helioscope vs Bidgely UtilityAI
- Helioscope vs Honeywell Building Management
- Helioscope vs Oracle Utilities
- Helioscope vs Petrel E&P Software
- Helioscope vs Siemens EnergyIP
- Helioscope vs SolarWinds
- Helioscope vs Azelio Energy Storage
- Helioscope vs Clean Power Research PowerClerk
- Helioscope vs Enerex
- Helioscope vs Stem Athena
- Helioscope vs AutoGrid Flex
- Helioscope vs PowerFactory DIgSILENT
- Helioscope vs GE Digital GridOS
- Helioscope vs SMA Energy
- Helioscope vs Johnson Controls Metasys


