Software · head to head
Carlson Mining vs PCBC
The short version
- They diverge on capability: Carlson Mining covers Pit design, PCBC covers Pit optimization.
Where they differ
Only the attributes on which Carlson Mining and PCBC actually diverge.
| Attribute | Carlson Mining | PCBC |
|---|---|---|
| Founded | 1983 | 1981 |
Identical on both: starting price (On request), pricing model (subscription), free tier (No), platforms (Windows), user rating (Not yet rated), category (Unknown).
What each one covers
Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.
Only in Carlson Mining
- Pit design
- Grade control
- Production planning
- Survey integration
- Mapping
- AutoCAD
- ArcGIS
- GPS
Only in PCBC
- Pit optimization
- Pushback scheduling
- Cutoff grade analysis
- NPV maximization
- Sensitivity analysis
- Surpac
- Whittle
- MineSched
Both cover
- Windows support
What people use each for
The jobs each tool is most often brought in to do.
Carlson Mining
- Pit designnot PCBC
- Grade controlnot PCBC
- Mine planningnot PCBC
- Surveyingnot PCBC
- Mappingnot PCBC
PCBC
- Pit optimizationnot Carlson Mining
- Pushback designnot Carlson Mining
- Cutoff optimizationnot Carlson Mining
- Economic analysisnot Carlson Mining
Where each one falls short
Documented limitations, not opinions. Every one is a constraint you would hit in normal use.
Carlson Mining
Nothing recorded yet. See the Carlson Mining review.
PCBC
- Dassault Systemes GEOVIA PCBC has no published commercial pricing and is sold via direct contact, with a separate Academic License Program as the only named alternative tier
Pricing, plan by plan
Carlson Mining
On request- Carlson Mining Standard$7000/year
- Mining design
- Pit design
- Grade control
- Carlson Mining Professional$15000/year
- Advanced mine planning
- Production scheduling
- Equipment management
PCBC
On request- PCBC Standard$12000/year
- Pit optimization
- Pushback design
- Economic analysis
Which should you pick?
Choose Carlson Mining if
- You need pit design.
- You work on Windows.
- You also want grade control.
Choose PCBC if
- You need pit optimization.
- You work on Windows.
- You also want pushback scheduling.
Questions people ask
- Is Carlson Mining or PCBC better?
- Neither clearly leads. Carlson Mining starts at On request and PCBC at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
- Which is cheaper, Carlson Mining or PCBC?
- Carlson Mining starts at On request and PCBC at On request.
- Does Carlson Mining or PCBC run on more platforms?
- Both run on Windows, so platform support will not decide this one for you.
- What is Carlson Mining best used for?
- Carlson Mining is most often used for pit design, grade control, mine planning, surveying. Of those, pit design and grade control are not what PCBC is typically brought in for.
- What can Carlson Mining do that PCBC cannot?
- Carlson Mining covers Pit design, Grade control, Production planning, Survey integration. PCBC covers Pit optimization, Pushback scheduling, Cutoff grade analysis, NPV maximization. Both handle Windows support.
Related pages
More on Carlson Mining
Keep looking
Other head to heads
- Carlson Mining vs Caterpillar MineStar
- Carlson Mining vs Leapfrog Geo
- Carlson Mining vs Deswik Suite
- Carlson Mining vs Dassault Systemes GEOVIA
- Carlson Mining vs Datamine
- Carlson Mining vs Hexagon PPM Mining
- Carlson Mining vs Micromine
- Carlson Mining vs Datamine Studio RM
- Carlson Mining vs Maptek I-Site
- Carlson Mining vs Minemax
- Carlson Mining vs Promine
- Carlson Mining vs Surpac
- Carlson Mining vs Trimble Mining
- Carlson Mining vs Vulcan
- Carlson Mining vs 3DEC
- Carlson Mining vs acQuire GIM Suite
- Carlson Mining vs Cority EHS
- Carlson Mining vs Enablon EHS
- PCBC vs Caterpillar MineStar
- PCBC vs Leapfrog Geo
- PCBC vs Deswik Suite
- PCBC vs Dassault Systemes GEOVIA
- PCBC vs Datamine
- PCBC vs Hexagon PPM Mining
- PCBC vs Micromine
- PCBC vs Datamine Studio RM
- PCBC vs Maptek I-Site
- PCBC vs Minemax
- PCBC vs Promine
- PCBC vs Surpac
- PCBC vs Trimble Mining
- PCBC vs Vulcan
- PCBC vs 3DEC
- PCBC vs acQuire GIM Suite
- PCBC vs Cority EHS
- PCBC vs Enablon EHS


