Softwr

Software · head to head

Carlson Mining vs PCBC

Carlson Mining logo

Carlson Mining

Software

Mining and surveying software solution

From
On request
Rated
-
PCBC logo

PCBC

Software

Pit optimisation and scheduling software

From
On request
Rated
-

The short version

  • They diverge on capability: Carlson Mining covers Pit design, PCBC covers Pit optimization.

Where they differ

Only the attributes on which Carlson Mining and PCBC actually diverge.

Attributes where Carlson Mining and PCBC differ
AttributeCarlson MiningPCBC
Founded19831981

Identical on both: starting price (On request), pricing model (subscription), free tier (No), platforms (Windows), user rating (Not yet rated), category (Unknown).

What each one covers

Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.

Only in Carlson Mining

  • Pit design
  • Grade control
  • Production planning
  • Survey integration
  • Mapping
  • AutoCAD
  • ArcGIS
  • GPS

Only in PCBC

  • Pit optimization
  • Pushback scheduling
  • Cutoff grade analysis
  • NPV maximization
  • Sensitivity analysis
  • Surpac
  • Whittle
  • MineSched

Both cover

  • Windows support

What people use each for

The jobs each tool is most often brought in to do.

Carlson Mining

  • Pit designnot PCBC
  • Grade controlnot PCBC
  • Mine planningnot PCBC
  • Surveyingnot PCBC
  • Mappingnot PCBC

PCBC

  • Pit optimizationnot Carlson Mining
  • Pushback designnot Carlson Mining
  • Cutoff optimizationnot Carlson Mining
  • Economic analysisnot Carlson Mining

Where each one falls short

Documented limitations, not opinions. Every one is a constraint you would hit in normal use.

Carlson Mining

Nothing recorded yet. See the Carlson Mining review.

PCBC

  • Dassault Systemes GEOVIA PCBC has no published commercial pricing and is sold via direct contact, with a separate Academic License Program as the only named alternative tier

Pricing, plan by plan

Carlson Mining

On request
  • Carlson Mining Standard$7000/year
    • Mining design
    • Pit design
    • Grade control
  • Carlson Mining Professional$15000/year
    • Advanced mine planning
    • Production scheduling
    • Equipment management

PCBC

On request
  • PCBC Standard$12000/year
    • Pit optimization
    • Pushback design
    • Economic analysis

Which should you pick?

Choose Carlson Mining if

  • You need pit design.
  • You work on Windows.
  • You also want grade control.

Choose PCBC if

  • You need pit optimization.
  • You work on Windows.
  • You also want pushback scheduling.

Questions people ask

Is Carlson Mining or PCBC better?
Neither clearly leads. Carlson Mining starts at On request and PCBC at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
Which is cheaper, Carlson Mining or PCBC?
Carlson Mining starts at On request and PCBC at On request.
Does Carlson Mining or PCBC run on more platforms?
Both run on Windows, so platform support will not decide this one for you.
What is Carlson Mining best used for?
Carlson Mining is most often used for pit design, grade control, mine planning, surveying. Of those, pit design and grade control are not what PCBC is typically brought in for.
What can Carlson Mining do that PCBC cannot?
Carlson Mining covers Pit design, Grade control, Production planning, Survey integration. PCBC covers Pit optimization, Pushback scheduling, Cutoff grade analysis, NPV maximization. Both handle Windows support.

Related pages

Other head to heads