Mining & Resources · head to head
Minemax vs Datamine Studio RM

Minemax
Mining & Resources
Integrated mining software for geological and operational excellence
- From
- On request
- Rated
- -

Datamine Studio RM
Mining & Resources
Resource modeling and estimation software
- From
- On request
- Rated
- -
The short version
- Each has a real cost: Minemax minemax.com/products returns a 301 redirect to dataminesoftware.com; Minemax products are now sold within the Datamine planning range; Datamine Studio RM no price, licence type, subscription term or system requirement is published anywhere on the Datamine site
- They diverge on capability: Minemax covers Geological modeling, Datamine Studio RM covers Geostatistical analysis.
Where they differ
Only the attributes on which Minemax and Datamine Studio RM actually diverge.
| Attribute | Minemax | Datamine Studio RM |
|---|---|---|
| Founded | 1995 | 1981 |
Identical on both: starting price (On request), pricing model (subscription), free tier (No), platforms (Windows), user rating (Not yet rated), category (Mining & Resources).
What each one covers
Drawn from each product's published feature list. An absence here means we hold no record of it - not that the product lacks it.
Only in Minemax
- Geological modeling
- Mine design
- Production scheduling
- Pit optimization
- Datamine
- SAP
Only in Datamine Studio RM
- Geostatistical analysis
- Block modeling
- Variogram modeling
- Grade control
- Studio OP
- Studio UG
Both cover
- Resource estimation
- Vulcan
- Surpac
- Leapfrog
- Windows support
What people use each for
The jobs each tool is most often brought in to do.
Minemax
- Strategic open pit and underground mine schedule optimisationnot Datamine Studio RM
- Life of mine planning to maximise net present valuenot Datamine Studio RM
- Operational short interval mine schedulingnot Datamine Studio RM
Datamine Studio RM
- Geological resource estimation and grade modellingnot Minemax
- Processing large volumes of drillhole and sample datanot Minemax
- 3D visualisation of orebody modelsnot Minemax
Where each one falls short
Documented limitations, not opinions. Every one is a constraint you would hit in normal use.
Minemax
- minemax.com/products returns a 301 redirect to dataminesoftware.com; Minemax products are now sold within the Datamine planning range
- No pricing is published for any Minemax product; licences are obtained by contacting the Datamine sales team
- Products are sold as role based Planning Bundles rather than individual licences, with the claimed saving of up to 33 percent measured against standalone licence cost
Datamine Studio RM
- No price, licence type, subscription term or system requirement is published anywhere on the Datamine site
- There is no dedicated Studio RM product page linked from the site; the product appears only inside a customer case study
Pricing, plan by plan
Minemax
On request- Minemax Standard$13000/year
- Geological modeling
- Mine design
- Resource estimation
- Minemax Premium$23000/year
- Advanced optimization
- Production scheduling
- Fleet management
Datamine Studio RM
On request- Studio RM$10000/year
- Resource modeling
- Geostatistics
- Block modeling
- Studio RM Professional$18000/year
- Advanced variography
- Conditional simulation
- Multi-element modeling
Which should you pick?
Choose Minemax if
- You need geological modeling.
- You work on Windows.
- You also want mine design.
Choose Datamine Studio RM if
- You need geostatistical analysis.
- You work on Windows.
- You also want block modeling.
Questions people ask
- Is Minemax or Datamine Studio RM better?
- Neither clearly leads. Minemax starts at On request and Datamine Studio RM at On request, and user ratings are close enough to be indistinguishable. Choose on capability and platform support.
- Which is cheaper, Minemax or Datamine Studio RM?
- Minemax starts at On request and Datamine Studio RM at On request.
- Does Minemax or Datamine Studio RM run on more platforms?
- Both run on Windows, so platform support will not decide this one for you.
- What is Minemax best used for?
- Minemax is most often used for strategic open pit and underground mine schedule optimisation, life of mine planning to maximise net present value, operational short interval mine scheduling. Of those, strategic open pit and underground mine schedule optimisation and life of mine planning to maximise net present value are not what Datamine Studio RM is typically brought in for.
- What can Minemax do that Datamine Studio RM cannot?
- Minemax covers Geological modeling, Mine design, Production scheduling, Pit optimization. Datamine Studio RM covers Geostatistical analysis, Block modeling, Variogram modeling, Grade control. Both handle Resource estimation, Vulcan, Surpac, Leapfrog.
Related pages
More on Datamine Studio RM
Other head to heads
- Minemax vs Caterpillar MineStar
- Minemax vs Leapfrog Geo
- Minemax vs Deswik Suite
- Minemax vs Dassault Systemes GEOVIA
- Minemax vs Datamine
- Minemax vs Hexagon PPM Mining
- Minemax vs Micromine
- Minemax vs Maptek I-Site
- Minemax vs Promine
- Minemax vs Surpac
- Minemax vs Trimble Mining
- Minemax vs Vulcan
- Minemax vs 3DEC
- Minemax vs acQuire GIM Suite
- Minemax vs Carlson Mining
- Minemax vs Cority EHS
- Minemax vs Enablon EHS
- Datamine Studio RM vs Caterpillar MineStar
- Datamine Studio RM vs Leapfrog Geo
- Datamine Studio RM vs Deswik Suite
- Datamine Studio RM vs Dassault Systemes GEOVIA
- Datamine Studio RM vs Datamine
- Datamine Studio RM vs Hexagon PPM Mining
- Datamine Studio RM vs Micromine
- Datamine Studio RM vs Maptek I-Site
- Datamine Studio RM vs Promine
- Datamine Studio RM vs Surpac
- Datamine Studio RM vs Trimble Mining
- Datamine Studio RM vs Vulcan
- Datamine Studio RM vs 3DEC
- Datamine Studio RM vs acQuire GIM Suite
- Datamine Studio RM vs Carlson Mining
- Datamine Studio RM vs Cority EHS
- Datamine Studio RM vs Enablon EHS
